Blog

Field notes: the week the river moved faster than the claims queue

A road-closed sign blocking a flooded gravel road next to a river, with bluffs in the background, Kellogg, MN.

The river crested on a Tuesday afternoon, and by Wednesday morning half our exposure file sat in a disaster declaration that hadn't even been signed yet. That's the thing about river flooding versus the slow-building storm surge most of our cat plans are written for: it doesn't wait for a response team to spin up. The water rises, holds for a day or two, and starts dropping before the first wave of calls has even died down.

By Thursday the call center had logged more first notices of loss than the adjusting staff could physically visit in three weeks. Standard practice kicked in: pull the policy list for the affected counties, cross-reference against news footage and gauge readings, triage by hand. Someone on the team was genuinely scrolling through local TV station b-roll trying to work out whether a cul-de-sac three streets back from the gauge station had taken water or just lost power for a day.

Desk review looks like that when the only inputs are a river gauge forty miles upstream and a reporter standing on a bridge. The gauge tells you what happened at one point in the channel. It doesn't tell you whether the floodwall behind the strip mall held, or whether that subdivision up on the ridge sits high enough to have actually stayed dry all week.

What we needed was ground truth that moved at the same speed as the water. The river did its damage in days. Our claims queue moved in weeks, because every address needed a person to weigh a map, a gauge chart, and a grainy news clip and reach a judgment on the one thing none of those sources was built to answer precisely: did this parcel get wet.

A few adjusters started keeping their own lists, grouping policies by subdivision and estimating exposure off elevation data pulled from the county GIS site. It worked, mostly. It also meant two adjusters sometimes reached opposite conclusions about neighboring streets, because the elevation layer was a decade old and the floodplain had shifted since the last upstream channel project.

What stuck with me after that week wasn't the volume. A regional book plans for volume. It was how little of the delay had to do with adjusting the claims themselves and how much of it had to do with figuring out which claims needed an adjuster in the first place. Once someone had eyes on a property, the settlement conversation moved fast. Getting to that conversation was where the week went.

We've since spent time looking at what it would take to run the exposure file directly against an observed water extent instead of reconstructing the flood footprint secondhand from gauge reports and news coverage. Flood Extent Mapping is built for exactly that gap: pull high-resolution imagery as soon as skies clear after the event, lay the mapped water polygon against the policy list, and let the addresses clearly outside the water move straight to fast-track while everything inside or on the edge routes to an adjuster with the polygon already attached.

The river is always going to move faster than a desk review built on secondhand reports. If your team is still piecing together the flood footprint from gauge charts and TV footage after the next event, it's worth seeing what the triage list looks like when the water extent does that work for you.